These roads are closing this weekend for the Shamrock’n race events

Shamrock’n, the annual 5k, 10k and half marathon event organized by Fleet Feet, will close various streets throughout Sacramento on the mornings of Saturday, March 11 and Sunday, March 12.

Residents and motorists are advised to check the maps below and add extra time if they plan on driving in or out of the area during the morning hours. All races begin and end at Sutter Health Park.

Those living in the Land Park neighborhood can locate their specific area on the race’s neighborhood plan map for the times participants are expected to be in the area for Sunday’s half marathon.

The Sacramento Police Department will facilitate rolling street closures. Officers will close streets as late as possible and reopen as early as safety allows.

Saturday, March 11 (Closures begin at 8 a.m.)

  • Capitol Mall (north side) between Tower Bridge and 7th Street (north side of street)
  • 7th Street between Capitol Mall and R Street (west side of street)
  • R Street between 7th Street and 2nd Street (full closure)
  • Front Street between R Street and O Street (full closure)
  • O Street between Front Street and 2nd Street (full closure)
  • 2nd Street between O Street and N Street (full closure)
  • N Street between 2nd Street and 4th Street (north lane closed)
  • 4th Street between N Street and Capitol Mall (full closure)
  • Capitol Mall (south side) between 4th Street and Tower Bridge (full closure)

 

 

 

 

 

 

 

 

 

Sunday, March 12 (Closures begin at 7:45 a.m.)

  • 5th Street between Ballpark Drive and Tower Bridge Gateway (east lane)
  • Tower Bridge Gateway between 5th Street and Tower Bridge (full closure)
  • Tower Bridge (full closure)
  • Neasham Circle between Tower Bridge and Front Street (full closure)
  • Front Street Neasham Circle and J Street (full closure)
  • J Street between Front Street and 2nd Street (full closure)
  • 2nd Street between J Street and L Street (full closure)
  • Neasham Circle between 2nd Street and Front Street (full closure)
  • Front Street between Neasham Circle and Sacramento River Bike Trail (full closure)
  • Sacramento River Bike Trial between Front Street and Broadway (full closure)
  • Broadway between Sacramento River Bike Trail and Front Street (full closure)
  • Front Street between Broadway and Ramp Way (runners on east side)
  • Ramp Way between Front Street and Sacramento River Bike Trail (runners on east side)
  • Sacramento River Bike Trail between parking lot and Westin Hotel (runners on trail)
  • Riverside Boulevard between Karbet Way to Sutterville Road (full closure)
  • Riverside Boulevard to 12th Ave (runners on west side)
  • 12th Avenue between Riverside Boulevard and E Park Road (full closure)
  • E Park Road to 12th Avenue (full closure)
  • 12th Avenue between E Park Road and 13th Street (full closure)
  • 13th Street between Park Road and 15th Avenue (full closure)
  • 15th Avenue between 13th Street and Land Park Drive (runners on north side)
  • Land Park Drive between 15th Avenue and 14th Avenue (full closure)
  • 14th Avenue between Land Park Drive and 18th St (full closure)
  • 18th Street between 14th Avenue and 19th Street (full closure)
  • 19th Street between 18th Street and 14th Avenue (full closure)
  • 14th Avenue between 19th Street and 13th Avenue (full closure)
  • 13th Avenue between 11th Avenue and 13th Street (full closure)
  • 13th Street between 11th Avenue and 8th Avenue (full closure)
  • 8th Avenue between 13th Street and Riverside Boulevard (full closure)
  • Riverside Boulevard between 8th Avenue and 7th Avenue (runners on east side)
  • 7th Avenue between Riverside Boulevard and Govan Way (full closure)
  • Govan Way between 7th Avenue and Regina Way (full closure)
  • Regina Way between Govan Way and Vallejo Way (full closure)
  • Vallejo Way between Regina Way and 5th Street (full closure)
  • 5th Street between Vallejo Way and Cleat Lane (full closure)
  • 1st Avenue between 5th Street and 3rd Street (full closure)
  • 3rd Street between 1st Avenue and Broadway (full closure)
  • Broadway between 3rd Street and Front Street (runners on north side)
  • Front Street between Broadway and R Street (runners on east side)
  • R Street bike overcrossing between Front Street and 5th Street (full closure)
  • 5th Street between R Street and N Street (full closure)
  • N Street between 5th Street and 7th Street (runners on north side)
  • 7th Street between N Street and Capitol Mall (full closure)
  • Capitol Mall between 7th Street and Tower Bridge (full closure)
  • Tower Bridge between Capitol Mall and Tower Bridge Gateway (full closure)
  • Tower Bridge Gateway between 3rd Street and Riverfront Street (full closure)

%d bloggers like this: